After four years, the Dwarka Expressway Link will undergo renovations.
The primary highway, surface drain, and walkways will all be rebuilt as part of the Rs 11.8 crore project by November of this year. Along with slip roads, lighting at intersections, and road safety accessories like bollards, road studs, and cat’s eyes, the metropolitan authority will also build these.
On Saturday, work on renovating the road that separates sectors 102 and 102A got underway. According to locals, the 1.3 km road that connects the new sections has been in poor condition for nearly four years.
The primary highway, surface drain, and walkways will all be rebuilt as part of the Rs 11.8 crore project by November of this year. Along with slip roads, lighting at intersections, and road safety accessories like bollards, road studs, and cat’s eyes, the metropolitan authority will also build these.